Salthouse Harbour Hotel

Prior to demolition, scaffolding was erected complete with Monoflex sheeting to ensure no dust is released into external areas. Having removed and disposed of asbestos roof, a central chute system will be put in place so that debris can be placed in skips within the actual building ready for disposal off site. The steel frame will then be removed by use of oxyacetylene cutting equipment. The scaffolding will be dropped to each floor level as work proceeds. Site to be left clean and tidy ready for archeological dig, after which the area will be broken up and cleared away to a licensed recycling area."

Quayside Scaffolding with Monoflex

Quayside Scaffolding with Monoflex

Maximum protection for everyone’s safety

Maximum protection for everyone’s safety

Awaiting start of oxyacetalene cutting

Oxyacetalene cutting whilst Grab steadies steel beam

Gas cutting final bolt

Gas cutting final bolt

Grab clearing floor space for Cherry Picker

Grab clearing floor space for Cherry Picker

Gas cutting beam in readiness for grab to hold

Gas cutting beam in readiness for grab to hold

Floor removed

Floor removed

Steel beam being lowered to ground

Steel beam being lowered to ground by CAT 325 with Grab attachment